Practices · 44 services

Five practices, one technical record.

Everything a renewable energy project requires, from the first drone flight to the last performance report. Each service has its own code, deliverable and fee.

I

Site and environment

The site data on which the whole project rests.

Practice page →
  • T01
    Topographic and geodetic surveysSite plans, cadastral documentation, setting-out and land registry approval.
  • T02
    Drone scanningPhotogrammetry, orthophoto mosaics, LiDAR and digital terrain models.
  • T03
    Geotechnical and geological studiesBoreholes, penetration tests, slope stability, independent verification.
  • T04
    Foundation testingPull-out tests on piles and ground screws, soil resistivity (Wenner method).
  • T05
    Hydrological studiesFlood risk, surface run-off, water management permit.
  • T06
    Environmental studiesEnvironmental procedure, Natura 2000 appropriate assessment, impact study.
  • T07
    Energy yield studiesSolar resource, energy simulation, P50/P90 yield, losses.
  • T08
    Glare and shading studiesGlare effects on roads, airports and neighbouring properties.
II

Engineering and design

Project documentation, from feasibility to construction details.

Practice page →
  • D01
    Feasibility studiesSolar, storage and substations, with technical and economic indicators.
  • D02
    Building permit designDocumentation for the building permit (DTAC).
  • D03
    Technical and detailed designExecution design and construction details for all disciplines.
  • D04
    Substation design110 kV/MV substations: primary, secondary, protection, teleprotection, SCADA.
  • D05
    Grid connection design110 kV and MV overhead and underground lines, point of connection.
  • D06
    Grid studiesLoad flow, short circuit, power quality, compliance with ANRE grid codes.
  • D07
    PV mounting structures2P, 2L and 3L tables in S350GD+Z275 steel, with bills of materials.
  • D08
    Cost estimatesGeneral and per-object estimates under Government Decision 907/2016.
  • D09
    Construction schedulesCritical path, value schedule and cash flow.
III

Permitting and due diligence

The permits, contracts and risks that decide whether a project gets built.

Practice page →
  • R01
    Connection solution studiesGrid connection options with costs and timelines, for the connection permit.
  • R02
    Grid connection permit and agreementObtaining and updating the ATR, amendments, phasing.
  • R03
    Zoning, permits and approvalsThe approvals required by the zoning certificate.
  • R04
    Technical due diligenceThe real condition of the project and its risks, for investors and lenders.
  • R05
    Legal due diligenceLand, zoning, permits, contracts; carried out with partner law firms.
  • R06
    Technical expert reportsExisting structures, PV rooftops, interventions; by licensed experts.
  • R07
    Technical-legal opinionsFire safety, grid code compliance, contractual clauses.
  • R08
    Licensing and guarantees of originANRE generation licence and accreditation for guarantees of origin.
  • R09
    Funding applicationsStudies and documentation for EU funds and lenders.
  • R10
    Fire safety for rooftop solarImplementing Romanian fire code P118: fire breaks, firefighter access paths, cable routing, emergency disconnection, fire service approval.
IV

Independent technical advisory

Owner’s engineer: we review what the EPC designs, tenders, delivers and installs.

Practice page →
  • P01
    Full Project Technical AdvisoryContinuous advisory from notice to proceed to commissioning.
  • P02
    EPC selection and bid evaluationBids compared on the same criteria, with a recommendation.
  • P03
    Design reviewTechnical design, details, schematics, SCADA, PPC and EMS against the permit and codes.
  • P04
    Equipment reviewTechnical approval of main equipment before purchase.
  • P05
    Construction supervisionConformity, non-conformities, concealed works, physical progress.
  • P06
    Quality and testingInspection and test plans, factory (FAT) and site (SAT) acceptance tests.
  • P07
    Taking-overInspection, punch list, re-inspection, taking-over recommendation.
  • P08
    Grid connection and commissioningImplementation of the connection permit, commissioning, conditions for COD.
  • P09
    Technical risk managementPeriodic risk report with classification and actions.
  • P10
    Warranty and post-CODDefects, performance, the EPC’s warranty obligations.
V

Digital and operations

The plant after commissioning: data, inspections, performance.

Practice page →
  • O01
    Digital twin3D model of the plant, linked to equipment, documents and as-built records.
  • O02
    Drone thermographyHot spots, faulty strings, module degradation.
  • O03
    Performance monitoringPerformance ratio, availability, SCADA alarms, monthly report.
  • O04
    Performance auditI-V curves, electroluminescence, verification of performance guarantees.
  • O05
    Operation and maintenancePreventive and corrective maintenance plans, O&M contracts.
  • O06
    Digital project recordData room, document register, RACI matrix, as-built records.
  • O07
    Extension and repoweringAdding storage, replacing inverters, end of service life.

Project lifecycle

From the first drone flight to operation.

The table shows where each service applies. On a phone, scroll it sideways.

PracticeDevelopmentPermittingDesignProcurementConstructionTesting and CODOperation
I Site and environmentT01T02T03T05T06T07T08T06T04T01T02T02
II Engineering and designD01D06D02D03D04D05D07D08D09D07
III Permitting and due diligenceR01R02R04R05R09R02R03R10R10R08R06R07
IV Independent technical advisoryP09P03P02P04P05P06P07P08P10
V Digital and operationsO01O06O06O01O02O03O04O05O07

Contact

Request a consultation.

Send us the status of your project. Within two working days you receive a first view of the risks and a proposed engagement.